The vice-president of the Cuban Council of State, Ramiro Valdés, and other government officials inspected the largest Cuban bio-electric plant in the town of Ciro Redondo, about 450 kilometers east of Havana, on Oct 17.
October 18, 2018The Sahiwal Thermal Power Plant, built by POWERCHINA, passed a final evaluation by China Huaneng Group on Aug 17.
October 01, 2018A delegation led by Congolese Prime Minister Bruno Tshibala visited the under-construction Goma stadiumin the Republic of Congo on Aug 21, 2018.
September 29, 2018As of 24:00 on Sept 24, the total cumulative power generation capacity of the Kamchay Hydropower Station in Cambodia exceeded three billion kWh, setting a new record with 2,444 days of safe production.
September 25, 2018Ugandan President Yoweri Museveni visited the Karuma Hydropower Project site on Aug 23, 2018, accompanied by officials including Irene Muloni, the Minister of Energy and Mineral of Uganda, and Zheng Zhuqiang, Chinese Ambassador to Uganda. The visit attracted great attention from local media outlets.
September 24, 2018Zambian President Edgar Lungu attended the groundbreaking ceremony for Kafulafuta Water supply project in Copperbelt province, Zambia on Sept 21.
September 22, 2018SEPCO1, a subsidiary of POWERCHINA based in Shandong province, unveiled its Power Transmission and Distribution Engineering Research Institute (America) in Rio de Janeiro, Brazil, on Sept 20.
September 21, 2018The electric power output of Nam Ou River Cascade Hydropower Plant (first phase) in Laos exceeded 3 billion degrees on Aug 13, 2018, helping Laos move closer to its target of becoming the "storage battery of Southeast Asia."
September 19, 2018