Airfield Paving, Tunnel and Detention Ponds / New Doha International Airport located in Qatar. The project contract value is 379 million US dollars. The project was commenced on July 18th, 2005 and completed on January 29th, 2014. Sinohydro Corporation Limited took the lead to organize the implementation as a major shareholder of the JV.
The project is comprised of 2 airport runways of 4.85km and 4.25km in length, 3 landing fields, drainage system and lighting system, 4 catch basins, two traffic tunnels which are 800m long in both direction to the site and 600m long to free trade zone.