The Zina Solar Photovoltaic (PV) Park in Burkina Faso, the first photovoltaic project undertaken by POWERCHINA in the Central and West Africa region, recently achieved grid-connected power generation.
June 04, 2024The Kazakhstan Khromtau 150 Megawatts Wind Power Project has recently broken ground. It is the first project to be carried out under an EPC contract and built by POWERCHINA in Kazakhstan using short-term special risk financing.
June 04, 2024The first solar plant of the Zimbabwe Mini-grid Solar Project (Phase III), undertaken by POWERCHINA, recently completed commissioning and began test operations, marking a significant milestone for the project.
May 31, 2024The 18th Chinese medical team aiding Lesotho was invited to the site of the Lesotho Highlands Water Project by the POWERCHINA Lesotho Polihali Dam Joint Venture for a free clinic on May 23.
May 30, 2024The signing ceremony for the Kenya KPLC Rural Power Distribution Network Project, to be built by POWERCHINA, was held at the Presidential Palace in Kenya on May 27. William Samoei Ruto, Kenyan president, witnessed the signing.
May 29, 2024The Saraorci Photovoltaic Project, which is being built by POWERCHINA in Serbia, was recently successfully connected to the grid.
May 27, 2024The groundbreaking ceremonies for Lot 7B, Lot 8B, and Lot 11B sections of the Benin Municipal Asphalt Road Project Phase B2, constructed by POWERCHINA, were officially held on May 22-23 in the respective cities of Parakou, Kandi, and Djougo, Benin.
May 24, 2024Wang Xiaojun, vice-president of POWERCHINA, attended the 10th World Water Forum in Indonesia from May 17-22.
May 24, 2024